The FAA has proposed a Falcon 2000 airworthiness directive that would require operators of Dassault Falcon 50, 2000 and 2000EX business jets to replace main landing gear torque links that may have been damaged by high-temperature oxidation during manufacturing. The proposal, published in the Federal Register on November 12, 2026, covers 683 US-registered aircraft, and the agency estimates that fixing the worst-affected jets could cost up to about $303,000 each. Comments are open until December 28, 2026.
| At a glance | |
|---|---|
| Name / number | Proposed AD, Dassault Aviation Falcon 50, 2000 and 2000EX; Docket FAA-2026-13805; MCAI-2026-00064-T |
| Issuing authority | Federal Aviation Administration (US Department of Transportation) |
| Date issued | Published November 12, 2026 (Notice of proposed rulemaking) |
| Effective date | Not yet set; comment deadline December 28, 2026 |
| Scope | 683 US-registry airplanes; up to 178 may carry an affected part |
Key changes in the Falcon 2000 airworthiness directive
The proposal targets the torque links on the main landing gear (MLG), the hinged arms that keep the gear’s sliding and fixed parts aligned. The FAA says some of these parts may have suffered high-temperature oxidation when they were made, which can weaken them. Left unaddressed, the condition could lead to MLG failure, damage to the airplane and injuries to occupants.
Under the proposed rule, operators would have to replace affected MLG torque links and would be barred from installing affected parts in the future. The action follows mandatory continuing airworthiness information (MCAI) from the state of design, as is standard when the FAA adopts a foreign authority’s safety finding for US-registered aircraft. The proposal uses a threshold of 7,100 flight cycles since installation to define when a main landing gear fitted with an affected part can still be treated as serviceable.
Torque links are small components, but they carry steering and braking loads every time the aircraft taxis, takes off and lands. Because a defect that originates in manufacturing can sit undetected inside an otherwise well-maintained gear, regulators tend to act through part-number screening and replacement rather than repeated inspection alone. That approach gives operators a defined fix, but it also means the cost lands up front rather than being spread across routine maintenance visits.
Who is affected
The directive would apply to owners and operators of Falcon 50, Falcon 2000 and Falcon 2000EX jets on the US register: corporate flight departments, charter and fractional operators, and maintenance organizations that support the fleet. Of the 683 airplanes in scope, the FAA estimates that as many as 178 may have an affected torque link installed. Operators abroad will typically face parallel requirements from their own regulator based on the same MCAI.
Timeline
- November 12, 2026: NPRM published in the Federal Register.
- December 28, 2026: deadline for public comments on Docket FAA-2026-13805.
- After comments: the FAA reviews feedback and may issue a final AD, which will set the effective date and compliance times.
Impact on the industry and investors
The FAA’s cost table frames the financial stakes clearly. Replacement labor is estimated at 36 work-hours at $85 per hour, or $3,060 per airplane. If an entire replacement main landing gear is needed, parts could cost up to $300,000, putting the total at up to $303,060 per aircraft. Across all US operators that could reach roughly $53.9 million. A cheaper option, rebuilding the gear by replacing the torque link assemblies, is costed at $48,990. The agency adds that the manufacturer may cover some costs under warranty, which could reduce the burden for many owners.
For the business-aviation market, the main effects are downtime and valuation. Aircraft awaiting parts may be grounded, and supply of replacement assemblies could become the bottleneck. Buyers and lenders reviewing pre-owned Falcon 50 and 2000-series jets will likely ask for proof of compliance or part serial-number checks. The proposal sits alongside other recent certification updates, including the FAA’s acceptance of updated Part 23 standards and the evolving Part 108 BVLOS drone rule.
The financial exposure is uneven. Operators whose aircraft carry unaffected parts face only an inspection of records, while those with affected links near the cycle threshold face the highest bills. The FAA has not yet published a separate benefit estimate for the proposal, so the comment period is the main opportunity for owners, MROs and industry associations to supply data on parts lead times and realistic compliance windows.
Compliance: what to watch
- Check MLG torque link part and serial numbers against the affected list referenced in the MCAI.
- Track flight cycles on installed torque links relative to the 7,100-cycle serviceability threshold.
- Contact Dassault and your MRO early about part availability and warranty coverage.
- Consider filing comments by December 28 if compliance times or costs look unworkable for your fleet.
- Review aircraft records in any pending purchase or financing transaction.
FAQ
Is the Falcon 2000 torque link AD already in force?
No. It is a proposed rule. Requirements become mandatory only when the FAA publishes a final airworthiness directive with an effective date.
How much could compliance cost?
The FAA estimates $3,060 in labor, plus up to $300,000 for a replacement main landing gear, or $48,990 for a rebuild using new torque link assemblies. Warranty may offset some costs.
Which aircraft are covered?
Dassault Falcon 50, Falcon 2000 and Falcon 2000EX airplanes. The FAA counts 683 on the US register, of which up to 178 may have an affected part.
Official source
- Federal Register, November 12, 2026 (Vol. 91, No. 217): proposed rules, including Docket FAA-2026-13805
- Regulations.gov: Docket FAA-2026-13805
This article is for general information only and does not constitute legal or investment advice.